Four checkpoints between the aggregate stockpile and your structural consultant's sign-off.
28-dayCube tested
2QC engineers / plant
ISO 90012015 certified
DLC–M60+Grades tested
Where concrete is checked
- Incoming material — aggregate grading and silt, sand quality, cement freshness and admixture batch, checked to IS 383 and IS 9103.
- Mix design — proportioning to IS 10262 for the target grade, exposure, workability and pour method, with trial cubes cast and tested.
- Batching & slump — automatic weighing on every batch, moisture-corrected, with slump measured to IS 1199.
- Site verification — slump re-checked at site before discharge; a load outside tolerance returns to the plant.
- Cube sampling — samples cast, cured and tested to IS 516 at 7 and 28 days.
- Reporting — compressive strength results shared with the customer and consultant.
Your part
A cube result proves the concrete that left our plant was right. Reaching full strength in your slab also depends on compaction and, above all, curing: start within two hours of placing, apply slurry the same day as casting, and keep it continuously wet for the specified period.
Ready to talk concrete?
Tell us the grade, the volume and the pour date and we will confirm from the nearest plant.